On July 30, 2026 on a routine surveillance flight over the Hurricane Creek watershed I happened to see this excavation sitting right behind the ball park along Hwy 216. The streak of red dirt looked almost as large as the ballpark itself.
There is a connection to this development and enforcing something as big as a data center
A lot of things have taken place since that first flight surrounding the first data center. Then there was 1 then 3 and now a 4th one is rumored to be built in the very headwaters of Hurricane Creek, an impaired stream with federal protection with a TMDL, Total Maximum Daily Load which sets restrictions for parameters like turbidity and sediment. These unchecked subdivisions are also the main sources of this type pollution in the country, not just here.
![]() |
| Hurricane Creek behind the Middle School |
This post is a bit long and in-depth because of the circumstances. Normally I would file the complaint with the state and that's it. This time however I felt it that it was too important to ignore.
There is a confirmed data center permitted for the Brookwood area and the environmental consequences could be quite dire. We know of 2 more such data centers heading for the watershed and ALL are in the headwaters of the creek which for the most part has not been as severely impacted as some of the lower stretches.
I finally got enough information to file an official complaint with Alabama Department of Environmental Management (ADEM). I also filed an inquiry to the ADIR AML Division (Abandoned Mine Land's).
ADEM confirmed that the site was excavated and developed without a state permit for such activity. The National Pollutant Discharge Elimination System (NPDES) permit states what the developer can and can not do. The permit is not just a suggestion, it is the law.
The permit requires that a site plan and "Best Management Plan" (BMP) must be submitted with all potential outfalls to the main stream. In this case that stream is Blanchet Branch, a tributary of Hurricane Creek. They had no such plan on file. According to Brookwood Engineer, Colins Espy no such development can proceed without a specific plan which is submitted and approved by the city. In the short video clip here you can here hear him saying that the NPDES is required and must be presented during permitting. What happened at "The Villages at Brookwood" ( BLACK WARRIOR DEVELOPMENTS) as it's known now?
After an inspection of the area I found that there was no NPDES posted at the entrance and several visible BMP deficiencies from the road. A drone flight over the excavation lead me to believe that it was bad enough to notify ADEM. If a developer does not post the permit at the entrance as prescribed by law then I can normally find issues throughout.
One thing that stuck out to me was the memory of seeing this same site years ago and reporting it as an abandoned coal mine highwall. I first saw and reported it to AML division in 2006.
Jeffrey E. Butler Abandoned Mine Land Program Manager |
Alabama Department of Workforce / AML Program" |
- Subsidence and Highwalls: Edge properties risk slope failure or dangerous drops (highwalls) left from mining. Regulations require stabilization of these earth walls before development approval. [1]"
- Subsidence and Highwalls: Edge properties risk slope failure or dangerous drops (highwalls) left from mining. Regulations require stabilization of these earth walls before development approval. [1]"
"John,
We inspected the site in response to your complaint and determined the site is not permitted, which is one of the reasons for the pending enforcement action. Our enforcement action will require them to submit a permit application, obtain permit coverage, and ensure proper BMPs are implemented.
The inspection report and enforcement documents will be available in e-FILE once the enforcement action is complete. In addition, the permit application and all that information will be in e-FILE as well once it is submitted.
Scott Hughes, Chief
Field Operations Division
ADEM
How is it that this went on for months without a permit when the Brookwood engineer stated in the council meeting on 07/21/26 that the rules apply to "EVERYONE"? (video above)